Container ship alongside in port, seen from above
Home / Products / ADMIRALTY / S-100
IMO · IHO · UKHO

S-100 – what the new ECDIS standard means for your fleet

S-100 is the new IHO data framework for ECDIS. From 1 January 2029, every newly installed ECDIS must be S-100 compatible. Here are the key dates – and what you can do now.

Timeline

The road to S-100

From the first IMO decision to mandatory S-100 compatibility – just keep scrolling and the timeline moves with you.

01 / 07Keep scrolling ↓Swipe sideways →
2022
November
IMO MSC.530(106)
S-100

New IMO standard adopted

The IMO adopts a revised ECDIS performance standard – the first international basis for type-approving S-100-capable ECDIS.

2024
May
S-421
Route exchange

Standard revised

A revision adds S-421 – a common format for exchanging route plans and voyage data between ship and shore.

2026
1 January
S-57
or
S-100

Either standard allowed

New ECDIS may be built to the previous or the new standard. Test standards for type approval are still pending.

2026–2028
Sea trials
S-100 test data

Trials and first data

Industry sea trials and early access to S-100 test data. The right time to assess when S-100 makes sense for your fleet.

2028
Expected
S-100 ECDIS
Type approval

First type-approved S-100 ECDIS

Type-approved S-100 ECDIS are expected to become commercially available. Until then, other systems serve for testing and familiarisation.

2029
1 January
S-100 capability required
MSC.530(106)/REV.1

Mandatory for new installations

Every newly installed ECDIS – including retrofits – must meet the new standard and be S-100 compatible.

Beyond
Dual operation
S-57
+
S-100

S-57 and S-100 side by side

Existing ECDIS do not have to be replaced. New ECDIS still display S-57 ENCs, and no end date for S-57 has been set.

Dates as published by the UK Hydrographic Office (December 2025). Timelines may still change.

More than a new chart format

What S-100 brings to the bridge

S-100 is a family of data formats that work together in one ECDIS. The first set focuses on route monitoring and situational awareness – complemented by S-421 for exchanging route plans.

S-101

Electronic Navigational Chart

The new ENC and foundation layer – successor to today's S-57 ENCs.

S-102

Bathymetric Surface

High-resolution water depths for a more detailed picture of the seabed.

S-104

Water Levels

Water level information for navigation.

S-111

Surface Currents

Surface current data directly in the ECDIS.

S-124

Navigational Warnings

Navigational warnings delivered as data on the chart display.

S-128

Catalogue of Nautical Products

A catalogue of the nautical data products available.

S-129

Under Keel Clearance

Under keel clearance management for passage planning in shallow waters.

S-421

Route Plan Exchange

A common format for exchanging route plans and voyage data between ship and shore.

Be prepared

What ship operators can do now

1

Now

Planning a new ECDIS? Ask the manufacturer about the upgrade path to S-100 and whether the hardware can handle S-100 data.

2

2026 – 2028

Follow the sea trials and early data access, and decide when a move to S-100 makes sense for your fleet.

3

From 2029

Make sure every new installation and retrofit is S-100 compatible and meets the latest IMO standard.

Questions about S-100?

As an ADMIRALTY Authorized Distributor, we keep you informed – and continue to supply your ADMIRALTY Vector Chart Service (AVCS) ENCs in the meantime.